In reply to Jon Read:
we were last around there about 6-7 weeks ago and what appeared to be the toilet block seemed to be fully built- outside shell-wise, but the turf was still dug up/ rolled back everywhere- presumably for levelling/ drainage work. I would phone them and see how far on they are, I think they quoted sometime this summer for being open but things can change I suppose.