User | Date | Notes | ||
---|---|---|---|---|
Jack Geldard | 14 Oct, 2022 |
Show βeta
βeta: 5.5 hours for us car to car. We didn’t know the route, stopped for a sandwich, but we didn’t mess around too much. A light set of cams, 6 draws and 4 slings would be good. Would do direct start next time. Original first pitch is 1 move past the 2 bolts then a long scramble up the gully on the left to reach a ledge with a holly tree. A 50m rope for the ab off the top doesn’t get you to the easy ground but to a ledge that you can scramble off. Descent path joins the GR20 alpine variant. | βeta? | |
Show beta
βeta: 5.5 hours for us car to car. We didn’t know the route, stopped for a sandwich, but we didn’t mess around too much. A light set of cams, 6 draws and 4 slings would be good. Would do direct start next time. Original first pitch is 1 move past the 2 bolts then a long scramble up the gully on the left to reach a ledge with a holly tree. A 50m rope for the ab off the top doesn’t get you to the easy ground but to a ledge that you can scramble off. Descent path joins the GR20 alpine variant. |
Please Login to view more details on the logged ascents