Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Date with a Frog | 6a ** | TR dog | eastley | 29 Aug, 2010 | Dancing Ledge | ||
Fallen Slab | 3a *** | TR O/S | eastley | 23 Aug, 2009 | Blacknor Beach | ||
Fallen Slab ArĂȘte | 3a *** | TR O/S | eastley | 23 Aug, 2009 | Blacknor Beach | ||
Imperfect | 3c * | TR O/S | eastley | 23 Aug, 2009 | Blacknor South | ||
Do Ixtlan | 5b * | TR dog | eastley | 23 Aug, 2009 | Blacknor South | ||
Well Done Poppet | 5c * | TR dnf | eastley | 23 Aug, 2009 | Blacknor South | ||
Chips with Everything | 5a * | TR dnf | 16 Aug, 2009 | The Cuttings | |||
Amen Corner | 5a ** | TR dnf | 16 Aug, 2009 | The Cuttings | |||
The Ramp | 5a * | TR dnf | 16 Aug, 2009 | The Cuttings | |||
Tom's Patience | 4a * | TR O/S | 8 Aug, 2009 | Winspit | |||
Bread Knife | 4a * | TR O/S | 8 Aug, 2009 | Winspit | |||
Iron Bar | 5a * | TR dog | 8 Aug, 2009 | Winspit | |||
Tom's Patience | 4a * | TR dog | Aug, 2009 | Winspit |