Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Calcutta Crack | HS 4c ** | Lead O/S | 23 May, 2012 | Roaches Upper Tier | |||
Slab 2 | S 4a * | AltLd β | 2 Apr, 2012 | Tryfan Fach [Little Tryfan] | |||
Grooved Arête | HVD 4a *** | AltLd β | 1 Apr, 2012 | Tryfan | |||
Battle of the Bulge | VS 4b ** | Lead β | 29 Mar, 2012 | Ramshaw Rocks | |||
Giant's Crawl (Summer) | D *** | Lead O/S | 24 Mar, 2012 | Dow Crag | |||
Valkyrie Corner | HS 4b | Lead O/S | 2 Mar, 2012 | Roaches Lower Tier | |||
Aged Crack | S 4a * | Lead O/S | 19 Feb, 2012 | Windgather Rocks | |||
Bulging Arête | S 4a | Lead O/S | 19 Feb, 2012 | Windgather Rocks | |||
Struggle | VS 4c | Lead O/S | 2012 | Windgather Rocks | |||
Clôd | HS 4a | Lead O/S | 30 Oct, 2011 | Craig Y Ddol | |||
Wallaby Wall | HS 4b * | Lead O/S | 28 Sep, 2011 | Roaches Skyline | |||
Breakfast Problem | VD * | Lead O/S | 28 Sep, 2011 | Roaches Skyline | |||
Lighthouse | VD | Lead O/S | 28 Sep, 2011 | Roaches Skyline | |||
Left Flake Crack | S 4a * | Lead O/S | 24 Sep, 2011 | Froggatt Edge | |||
North Climb | S 4a * | Lead O/S | 24 Sep, 2011 | Froggatt Edge | |||
Pedestal Route | HVD 4a *** | Lead O/S | 19 Sep, 2011 | Roaches Upper Tier | |||
Slab 2 | S 4a * | Lead O/S | 12 Jul, 2011 | Tryfan Fach [Little Tryfan] | |||
Freddie | HS 4b * | Lead O/S | 19 Jun, 2011 | Baggy Point | |||
Thin Crack | HS 4a * | Lead O/S | 11 Jun, 2011 | Back Forest | |||
Crack and Corner | HS 4c *** | Lead β | 2 Jun, 2011 | Roaches Upper Tier | |||
Damascus Crack | HS 4b ** | Lead rpt | 25 May, 2011 | Roaches Upper Tier | |||
Jeffcoat's Chimney | VD ** | Lead O/S | 25 May, 2011 | Roaches Upper Tier | |||
Studio | HS 4b ** | Lead O/S | 24 May, 2011 | Castle Naze | |||
Footstool Left | S 4a | Lead O/S | 24 May, 2011 | Castle Naze | |||
A.P. Chimney | HS 4a * | Lead O/S | 24 May, 2011 | Castle Naze |