Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Ledge Climb | HVD *** | AltLd | Pete campion | 29 Jun, 2013 | Bosigran | ||
Doorway | S 4a ** | AltLd | Pete campion | 29 Jun, 2013 | Bosigran | ||
Doorpost | HS 4b *** | AltLd | Pete campion | 29 Jun, 2013 | Bosigran | ||
Armada | HS 4a ** | AltLd | Pete campion | 19 Jun, 2013 | The Dewerstone | ||
Caesar's Nose | S 4a * | Lead | 10 Jun, 2013 | The Dewerstone | |||
Vala | HVS 5a ** | Lead | 10 Jun, 2013 | The Dewerstone | |||
Leviathan | VS 4c *** | Lead O/S | Alan Caley | 5 Jun, 2013 | The Dewerstone | ||
Fly On The Wall | HS 4b ** | 2nd | Alan Caley, Pete campion | 5 Jun, 2013 | The Dewerstone | ||
Doorpost | HS 4b *** | AltLd | Pete campion | 2 Jun, 2013 | Bosigran | ||
Andrew | S 4a ** | AltLd | Pete campion | 2 Jun, 2013 | Bosigran | ||
Demo Route | HS 4b *** | 2nd | 1 Jun, 2013 | Sennen | |||
Monday Face | VS 4b ** | Lead O/S | 1 Jun, 2013 | Sennen | |||
Letterbox | HS 4b ** | Lead O/S | 1 Jun, 2013 | Sennen | |||
Double Overhang | VS 4c ** | Lead | 1 Jun, 2013 | Sennen | |||
Fly On The Wall | HS 4b ** | Lead | 26 May, 2013 | The Dewerstone | |||
Vineyard | VS 4b ** | AltLd | 26 May, 2013 | The Dewerstone | |||
Wind Wall | HVS 5a * | Lead | 6 Sep, 2012 | Sheeps Tor | |||
Barking Crack | HVD * | Lead | 5 Sep, 2012 | Sheeps Tor | |||
Mushroom Wall | VS 5a * | Lead | 5 Sep, 2012 | Sheeps Tor | |||
Wind Wall | HVS 5a * | Lead | 5 Sep, 2012 | Sheeps Tor | |||
Workers Wall | HS 4a * | Lead | 5 Sep, 2012 | Sheeps Tor | |||
Original Route | S 4a * | 2nd | 10 Aug, 2012 | Luckey Tor (aka Eagle Rock) | |||
Eagle's Nest | S 4a ** | Lead O/S | 10 Aug, 2012 | Luckey Tor (aka Eagle Rock) | |||
Ivy Wall | VS 4c ** | Lead O/S | 10 Aug, 2012 | Luckey Tor (aka Eagle Rock) | |||
Vala | HVS 5a ** | Lead | 27 Jul, 2012 | The Dewerstone |