Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
The Devil's Slide | HS 4a *** | - | 20 Sep, 2020 | Lundy | |||
Devil's Spine | VS 4b * | Lead | 20 Aug, 2020 | Lundy | |||
The Devil's Slide | HS 4a *** | Lead | 19 Aug, 2020 | Lundy | |||
Papillons ArĂȘte | D+ 5c *** | - | 8 Aug, 2020 | Aiguille du Peigne | |||
Frison-Roche | TD- 6a *** | AltLd dog | 6 Aug, 2020 | Aiguilles Rouges | |||
L'Y Droite | 5b | Lead | 2 Aug, 2020 | Les Gaillands | |||
Le plantigrade magnésophage | 5c ** | Lead | 1 Aug, 2020 | Vallorcine | |||
Crakoukass | D+ 6a ** | AltLd | 29 Jul, 2020 | Aiguilles Rouges | |||
Autumn Gold | HS 4a * | - | 12 Oct, 2012 | Stanage North | |||
Bent Crack | HVD * | Lead O/S | 12 Oct, 2012 | Stanage North | |||
Kelly's Crack | VD ** | Lead O/S | 12 Oct, 2012 | Stanage North | |||
Intermediate Route | HVD * | Lead O/S | 1 Sep, 2012 | Sennen | |||
Civvy Route | HS 4b ** | Lead O/S | 1 Sep, 2012 | Sennen | |||
Demo Route | HS 4b *** | Lead O/S | 1 Sep, 2012 | Sennen | |||
Clob | VD * | Lead O/S | 31 Aug, 2012 | Bosigran | |||
Doorway | S 4a ** | AltLd O/S | 31 Aug, 2012 | Bosigran | |||
Doorpost | HS 4b *** | AltLd O/S | 8 Aug, 2012 | Bosigran | |||
Triangle Buttress Direct Start | f5 * | - | 8 Aug, 2012 | Burbage North | |||
Sail Buttress | HS 4b ** | 2nd | 3 Jun, 2012 | Birchen Edge | |||
Ash Tree Crack | VD * | Lead O/S | 25 Feb, 2012 | Burbage North | |||
Camperdown Crawl | HS 4c ** | Lead O/S | 25 Feb, 2012 | Birchen Edge | |||
Trafalgar Wall | S 4b ** | Lead O/S | 25 Feb, 2012 | Birchen Edge | |||
Sail Chimney | S 4a ** | Lead O/S | 25 Feb, 2012 | Birchen Edge |