Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
The Lone Arête | f5+ *** | Sent O/S | Meg | 14 Apr, 2009 | Stanage Plantation | ||
Scoops Groove | f5 *** | Sent O/S | Meg | 14 Apr, 2009 | Stanage Plantation | ||
Free Jump | f6B+ * | Sent x | Queenie Henn | 7 Apr, 2009 | Trowbarrow | ||
Ramp Traverse | f6C+ * | Sent x | Queenie Henn | 7 Apr, 2009 | Trowbarrow | ||
Coral Sea | VS 4c ** | Lead rpt | Queenie Henn | 7 Apr, 2009 | Trowbarrow | ||
Hit Me | V4 * | Sent O/S | Dave, Tom, Colin and Adam | 29 Mar, 2009 | Brin Rock | ||
Spank the Ramp | f6B *** | Sent O/S | Dave, Tom, Colin and Adam | 29 Mar, 2009 | Brin Rock | ||
Preppy | V3 ** | Sent O/S | Dave, Tom, Colin and Adam | 29 Mar, 2009 | Brin Rock | ||
Spirited | V5 ** | Sent x | Dave, Tom, Colin and Adam | 29 Mar, 2009 | Brin Rock | ||
The Slide | VS 4c ** | 2nd O/S | Shane | 26 Mar, 2009 | South Cove | ||
Insect Groove | HVS 5a *** | Lead O/S | Shane | 26 Mar, 2009 | South Cove | ||
Insect Flake | E1 5b * | Lead O/S | Shane | 26 Mar, 2009 | South Cove | ||
Insect Wall | VD | Lead O/S | Shane | 26 Mar, 2009 | South Cove | ||
Painted Wall | VD | 2nd O/S | Shane | 26 Mar, 2009 | South Cove | ||
North Descent | M | Solo O/S | Shane | 26 Mar, 2009 | South Cove | ||
The Mitre | HVS 5a * | Solo O/S | Shane | 25 Mar, 2009 | South Cove | ||
El Dorado | VS 4c | Solo O/S | Shane | 25 Mar, 2009 | South Cove | ||
The Spinechiller | E1 5a * | Solo O/S | Shane | 25 Mar, 2009 | South Cove | ||
Old Tawny Traverse | S | Solo O/S | Shane | 25 Mar, 2009 | South Cove | ||
The Spinechiller | E1 5a * | Solo O/S | Shane | 25 Mar, 2009 | South Cove | ||
Overhang Crack | S | Lead O/S | Shane | 22 Mar, 2009 | Souter Head | ||
Brooker's Arete | S *** | Lead O/S | Shane | 22 Mar, 2009 | Souter Head | ||
Slab Top Chimney | D ** | Lead O/S | Shane | 22 Mar, 2009 | Souter Head | ||
Swing Seam | S | Lead O/S | Shane | 22 Mar, 2009 | Souter Head | ||
Puffin Overhang | S | Lead O/S | Shane | 22 Mar, 2009 | Souter Head |