Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Pooh Slab using Offwidth | f3 | Sent O/S | Baz | 8 Sep, 2015 | Down Tor | ||
Pooh Slab | f5+ * | Sent O/S | Baz | 8 Sep, 2015 | Down Tor | ||
Diagonal Flakes | f4+ | Sent O/S | Baz | 8 Sep, 2015 | Down Tor | ||
Wall Direct | f5 | Sent O/S | Baz | 8 Sep, 2015 | Down Tor | ||
Wall Superdirect | f5+ | Sent O/S | Baz | 8 Sep, 2015 | Down Tor | ||
In Between | f3 | Sent O/S | Baz | 8 Sep, 2015 | Down Tor | ||
First Layback | f4 | Sent O/S | Baz | 8 Sep, 2015 | Down Tor | ||
Mantel Practice | f5 | Sent O/S | Baz | 8 Sep, 2015 | Down Tor | ||
Far Left Crack | f3+ | Sent O/S | Baz | 8 Sep, 2015 | Down Tor | ||
Apex Traverse | f4+ | Sent O/S | Baz | 8 Sep, 2015 | Down Tor | ||
Cheeky Pinch | f6A * | Sent O/S | Baz | 8 Sep, 2015 | Down Tor | ||
Colonel's Arete | VD ** | Solo | 9 Jun, 2015 | The Dewerstone | |||
Mucky Gully | D ** | Solo | 9 Jun, 2015 | The Dewerstone | |||
Caesar's Nose | S 4a * | Lead rpt | Baz | 9 Jun, 2015 | The Dewerstone | ||
Tower Crack | HS 4b * | 2nd rpt | Baz | 9 Jun, 2015 | The Dewerstone | ||
Burdock | HS 4a * | 2nd rpt | Baz | 29 May, 2015 | Sheeps Tor | ||
Slanting Crack | S 4a * | 2nd rpt | Baz | 29 May, 2015 | Sheeps Tor | ||
Wind Wall | HVS 5a * | Lead rpt | Baz | 29 May, 2015 | Sheeps Tor | ||
Shit Rock | f5+ | Sent rpt | Phil, Baz | 22 Apr, 2015 | Burrator Boulders | ||
Short Back and Sides | f5+ | Sent rpt | Phil, Baz | 22 Apr, 2015 | Burrator Boulders | ||
Rayond Briggs | f5 | Sent x | Phil, Chris, Baz | 22 Apr, 2015 | Burrator Boulders | ||
Just Top It Already | f5+ | Sent O/S | Phil, Chris, Baz | 22 Apr, 2015 | Burrator Boulders | ||
Cranked | f5+ | Sent O/S | Phil, Chris, Baz | 22 Apr, 2015 | Burrator Boulders | ||
Herbert the Pervert | f4+ | Sent O/S | Phil, Chris, Baz | 22 Apr, 2015 | Burrator Boulders | ||
Hidden Roof Traverse | f5 | Sent O/S | Phil, Chris, Baz | 22 Apr, 2015 | Burrator Boulders |