For those who don't wish to be forced into zuckerberglandbook for their climbing news, here's the update on climb bristol;
Forthcoming works on Suspension Bridge Buttress
In 2017 the Suspension Bridge Trust did us climbers a huge favour by clearing a lot of soil and vegetation off the West Face of Suspension Bridge Buttress.
The work was done to check for weaknesses in the buttress that might threaten the stability of the Suspension Bridge itself. They found some areas of concern, and so work is planned to stabilise the top of the buttress.
Some of you may have seen
https://www.bristol247.com/…/work-to-be-carried-out-to-str…/ which is written for general public interest. There are a number of points to bear in mind:
- Your BMC Access reps are in close contact with the Bridge Engineer over these works;
- The works will take place at the very top of the buttress, which will not significantly affect climbing routes;
- The work schedule has not been finalised – Natural England still have to give their consent to the works, and a contractor has to be appointed;
- During the work period there will be no access to the West Face during contractor’s working hours. BMC Access Reps will post notices on these restrictions on the approaches to the face, and the BMC RAD, and on social media;
- To the best of our knowledge climbs on the North Face are unaffected by the works.