 Colin Moody 23 Jan 2017
For anyone thinking of going up Ben More on Mull.
The bridge at Knock west of Salen is closed to vehicles for two weeks or more for repair, open for pedestrians.
andymac 23 Jan 2017
In reply to Colin Moody:

Shall have a longer walk than usual on Sunday then.

Can't let a closed bridge get in the way of my date with the Mountain Gods.

Hope I'm wrong but I suspect more than 2 weeks.
OP Colin Moody 24 Jan 2017
In reply to andymac:

Hope it’s a bit faster than the last bridge work under Ben More, they are scaffolding just now, photo link below.

http://www.colinmoody.com/Site/Mull.html#1
andymac 24 Jan 2017
In reply to Colin Moody:

Thanks for that.

Looks like the bridge needs a bit of TLC.

OP Colin Moody 02 Feb 2017
In reply to andymac:

Last I heard they plan to open the bridge to traffic on Monday.
OP Colin Moody 03 Feb 2017
In reply:

It's open now.
andymac 03 Feb 2017
In reply to Colin Moody:

Thanks Colin
OP Colin Moody 15 Apr 2017


The bridge will be closed again on Tuesday.

https://www.argyll-bute.gov.uk/knock-bridge-b8035-mull
 Mike-W-99 23 Apr 2017
In reply to Colin Moody:

It seems that not everyone knows this judging from the chat on the summit on Saturday. We were fine, bus to Kinloch Crossroads and up the south ridge.
OP Colin Moody 24 Apr 2017
In reply to Mike-W-99:

Yes. Still people driving up to the bridge (from both directions) then having to turn round. Maybe they don't notice the road signs.
 Fiona Reid 24 Apr 2017
In reply to Colin Moody:

The chap we chatted to on Saturday *had* seen the signs but decided to try the road anyways...
 lpretro1 06 May 2017
In reply to Fiona Reid:

Its going on until late June apparently - it may be open on occasions. Mostly open to pedestrians/cyclists