Dates: 1 March to 30 June
Reason: Nesting Birds
2024 update 6th April - the birds have moved to a different site this year, therefore the restriction has been lifted. This may change again so please check back and observe any signs if they reappear.
Rockfax Description
The central line has its own lower-off. © Rockfax
UKC Logbook Description
3 BRs to the central belay
John Allen, Nick Taylor 13/Aug/2015.
User | Date | Notes | ||
---|---|---|---|---|
Al Austin | 9 Oct, 2021 |
Show βeta
βeta: Transcription error somewhere I think, should be Silver Or Lead. | βeta? | |
Show beta
βeta: Transcription error somewhere I think, should be Silver Or Lead. |
||||
Neil McA | 9 Mar, 2021 |
Show βeta
βeta: This is the 7a. The grades of this and the route to the left appear to have been transposed. The 7a grade assumes you go direct, no touching the crack on the left on the top moves. | βeta? | |
Show beta
βeta: This is the 7a. The grades of this and the route to the left appear to have been transposed. The 7a grade assumes you go direct, no touching the crack on the left on the top moves. |
Please Login to view more details on the logged ascents
Grade: 6b ***
(Harpur Hill Quarry)