UKC

Restricted Access

No permission has been granted by the landowner for climbing access to this quarry.

Seasonal Restrictions

Dates: 6 April to 30 June

Reason: Nesting Birds

2024 - there is a seasonal restriction this year covering Sunshine Wall and the Upper Tier. Please do not enter this western end of the quarry. 

8m. The vertical wall on small holds left of the Hanging Slab to a shared lower off.

Nick Taylor, John Allen, Rob Allen Jan/2020.

Feedback

User Date Notes
nickcanute 10 Jul, 2021 Show βeta
βeta: Climb the centre of the pillar past the bolts to good handholds level with the lower off on the right (rock directly above wasn't good enough for separate lower off). Stepping off the route to the right is not the route and not recommended - poor rock.
βeta?
Show beta
βeta: Climb the centre of the pillar past the bolts to good handholds level with the lower off on the right (rock directly above wasn't good enough for separate lower off). Stepping off the route to the right is not the route and not recommended - poor rock.

Logged Ascents

14 users have logged this

Guidebooks for Goddard's Quarry

Not all climbs at crag may appear in this book

Please Login to view more details on the logged ascents

Voting
High 6a+
Mid 6a+
Low 6a+
High 6a
Mid 6a
Low 6a
High 5c
Mid 5c
Low 5c
Votes cast 4
Votes cast 3
Style of Ascent
Lead
Followed
Onsighted
Repeated
Flashed (β)
Not Set
Route of Interest
Coral Seas

Grade: 6a ***
(Harpur Hill Quarry)

Loading Notifications...