Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Little Crack | S 4b * | Lead O/S | Bryan | 5 Jun, 2010 | Harborough Rocks | ||
Cracked Wall | HVS 5b | 2nd | Bryan | 5 Jun, 2010 | Harborough Rocks | ||
The Arete | S 4a * | Solo | 5 Jun, 2010 | Harborough Rocks | |||
Trident Eliminate | HS 4b * | Lead | Bryan | 5 Jun, 2010 | Harborough Rocks | ||
Trident Obverse | D | Solo | 5 Jun, 2010 | Harborough Rocks | |||
The Blaster | HVS 5b | 2nd | Bryan | 5 Jun, 2010 | Harborough Rocks | ||
Little Chimney | M | Solo | 5 Jun, 2010 | Harborough Rocks | |||
Crinkle Crack | HS 4b * | Lead O/S | Bryan | 5 Jun, 2010 | Harborough Rocks | ||
Creased Wall | HVS 5a ** | 2nd | Bryan | 5 Jun, 2010 | Harborough Rocks | ||
Thin Air | VS 4b * | Lead O/S | Bryan | 5 Jun, 2010 | Harborough Rocks | ||
Bow Arete | D | Solo | 5 Jun, 2010 | Harborough Rocks | |||
Little Arete | D | Solo | 5 Jun, 2010 | Harborough Rocks | |||
Bow Ridge | VD | Solo | 5 Jun, 2010 | Harborough Rocks | |||
Introductory Wall | D | Solo | 5 Jun, 2010 | Harborough Rocks | |||
Overhanging Wall Variant | VD ** | Solo | 5 Jun, 2010 | Harborough Rocks | |||
Concave Wall | HVD 4a * | Solo | 5 Jun, 2010 | Harborough Rocks | |||
Steeple Arete | VD * | Solo | 5 Jun, 2010 | Harborough Rocks | |||
Mast Gully Crack | HS 4b * | 2nd | Tino, Adam and ODL | 23 May, 2010 | Birchen Edge | ||
Mast Gully Crack | HS 4b * | Lead dnf | Tino, Adam and ODL | 23 May, 2010 | Birchen Edge | ||
Trafalgar Wall | S 4b ** | 2nd | Tino, Adam and ODL | 23 May, 2010 | Birchen Edge | ||
Victory Crack | HS 4b * | 2nd | Tino, Adam and ODL | 23 May, 2010 | Birchen Edge | ||
Porthole Buttress | S 4a * | 2nd | Tino, Adam and ODL | 23 May, 2010 | Birchen Edge | ||
Stoked | S 4a * | 2nd | Tino, Adam and ODL | 23 May, 2010 | Birchen Edge | ||
Yo-Ho Crack | VD * | Lead O/S | Tino, Adam and ODL | 23 May, 2010 | Birchen Edge | ||
Rotunda Buttress | VS 4c * | TR | Roger and SMC | 15 May, 2010 | Roaches Upper Tier |