Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Prow Cracks | VD ** | Solo | 26 Sep, 1990 | Roaches Lower Tier | |||
Prow Corner | VD * | Solo | 26 Sep, 1990 | Roaches Lower Tier | |||
Doorpost | HS 4b *** | AltLd | Chris B | 22 Sep, 1990 | Bosigran | ||
Autumn Flakes | HS 4b ** | AltLd | Chris B | 22 Sep, 1990 | Bosigran | ||
Bachelor's Climb | VS 4c *** | Lead | Clare M, Steve B | 28 Jul, 1990 | Hen Cloud | ||
Hen Cloud Eliminate | HVS 5b *** | 2nd | Steve B | 28 Jul, 1990 | Hen Cloud | ||
Encouragement | E1 5b *** | 2nd | Steve B | 28 Jul, 1990 | Hen Cloud | ||
Central Climb Direct | VS 5a ** | 2nd | Steve B | 28 Jul, 1990 | Hen Cloud | ||
Diagonal Route | VS 5a * | Lead | Pete K, Jon B | 25 Jun, 1990 | Idwal Slabs (aka Cwm Idwal) | ||
Shadow Wall | VS 4c *** | - | Steve P | Jun, 1990 | Carreg Wastad | ||
Ardverikie Wall | HS 4b *** | 2nd | Chris B, Jon B | 27 May, 1990 | Binnein Shuas | ||
Arrow Route | VD *** | - | Jon B | 24 May, 1990 | Sron na Ciche | ||
Integrity | VS 4c *** | 2nd | Chris B, Jon B | 24 May, 1990 | Sron na Ciche | ||
Cioch Direct | S 4a * | 2nd | Chris B, Jon B | 24 May, 1990 | Sron na Ciche | ||
Labyrinth Direct Finish | S ** | 2nd | Jon B | 20 May, 1990 | Cir Mhor | ||
Labyrinth | VS 4b * | AltLd | Jon B | 20 May, 1990 | Cir Mhor | ||
South Ridge Direct | VS 5a *** | AltLd | Chris B, Jon B | 20 May, 1990 | Cir Mhor | ||
Hammer | VS 4c ** | AltLd | Chris B, Jon B | 20 May, 1990 | Cir Mhor | ||
Sou'wester Slabs | VD *** | AltLd | Jon B | 20 May, 1990 | Cir Mhor | ||
Prosperos Peril | S 4b * | AltLd | Guy C, Jon B | 18 May, 1990 | Cir Mhor | ||
Pagoda Ridge | S ** | AltLd | Guy C, Jon B | 18 May, 1990 | A'Chir | ||
Bosigran Ridge a.k.a Commando Ridge | VD *** | Lead | Pete C | 13 May, 1990 | Bosigran Ridge Area | ||
Staircase | D ** | Lead | Jo G | 12 May, 1990 | Sennen | ||
Demo Route | HS 4b *** | Lead | Pete C | 12 May, 1990 | Sennen | ||
Blenheim Gully | VS 4c * | Lead | Steve B | 6 May, 1990 | Gardom's Edge |