Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Olive Oil | 6a * | Lead O/S | 26 Mar, 2011 | Horseshoe Quarry | |||
Klingon | 4a | Lead O/S | 26 Mar, 2011 | Horseshoe Quarry | |||
Luke Skywalker | 4a * | Lead O/S | 26 Mar, 2011 | Horseshoe Quarry | |||
Uranus | 3c | Lead O/S | 26 Mar, 2011 | Horseshoe Quarry | |||
Legs Over | VS 4b * | Solo O/S | 20 Mar, 2011 | Harborough Rocks | |||
Overhanging Crack | VS 5a | Solo O/S | 20 Mar, 2011 | Harborough Rocks | |||
The Arete | S 4a * | Solo O/S | 20 Mar, 2011 | Harborough Rocks | |||
Creased Wall | HVS 5a ** | TR O/S | 20 Mar, 2011 | Harborough Rocks | |||
Crinkle Crack | HS 4b * | Lead O/S | 20 Mar, 2011 | Harborough Rocks | |||
Steep Ridge | VD * | Lead O/S | 20 Mar, 2011 | Harborough Rocks | |||
Harborough Crack | HS 4b * | Solo O/S | 12 Mar, 2011 | Harborough Rocks | |||
Pedestal Crack | S 4a * | Lead O/S | 12 Mar, 2011 | Harborough Rocks | |||
Overhanging Chimney Direct | S 4a ** | Lead O/S | 12 Mar, 2011 | Harborough Rocks | |||
Overhanging Wall Variant | VD ** | Lead O/S | 12 Mar, 2011 | Harborough Rocks | |||
Right Route | VD *** | 2nd O/S | 20 Nov, 2010 | Roaches Upper Tier | |||
Right-hand Route | HS 4c ** | Lead O/S | 20 Nov, 2010 | Roaches Upper Tier | |||
Left-hand Route | S 4b ** | 2nd O/S | 20 Nov, 2010 | Roaches Upper Tier | |||
Technical Slab | HS 4a *** | 2nd O/S | 20 Nov, 2010 | Roaches Upper Tier | |||
Manchester Buttress | HS 4b *** | Lead O/S | 19 Nov, 2010 | Stanage Popular | |||
Hollybush Crack | VD *** | 2nd O/S | 19 Nov, 2010 | Stanage Popular | |||
Mississippi Buttress Direct | VS 4c *** | TR O/S | 19 Nov, 2010 | Stanage Popular | |||
Slippery Slabs Direct | VS 4c * | 2nd O/S | 1 Sep, 2010 | Wildcat | |||
Tiger Route 1 | VS 4c * | 2nd O/S | 1 Sep, 2010 | Wildcat | |||
Broken Toe Groove | VS 4c * | 2nd O/S | 1 Sep, 2010 | Wildcat | |||
The Left Unconquerable | E1 5b *** | TR O/S | 22 Aug, 2010 | Stanage Plantation |