Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Suspension Bridge Arête | HVS 5a ** | 2nd O/S | 17 Apr, 1983 | Avon Gorge (Suspension Bridge... | |||
Piton Route | VS 4c ** | AltLd | 17 Apr, 1983 | Avon Gorge (Main Area) | |||
Pink Wall Traverse | HVS 5a ** | AltLd O/S | 17 Apr, 1983 | Avon Gorge (Main Area) | |||
Maltravers | E1 5a ** | AltLd O/S | 17 Apr, 1983 | Avon Gorge (Main Area) | |||
Right Angle | HS 4b *** | AltLd | 3 Apr, 1983 | Gurnard's Head | |||
Dextrose | HVS 5a ** | Lead O/S | 3 Apr, 1983 | Sennen | |||
Seal Slab | VS 4c ** | AltLd | 3 Apr, 1983 | Chair Ladder | |||
Pegasus | HS 4b *** | AltLd | 3 Apr, 1983 | Chair Ladder | |||
Mine Climb | HVS 5a | AltLd | 3 Apr, 1983 | Chair Ladder | |||
Helluva Slab | S 4a ** | Lead O/S | 2 Apr, 1983 | Porthgwarra Buttress and... | |||
The Royal Forester | VS 4c ** | Lead O/S | 1 Apr, 1983 | Zennor Cliff | |||
Sheep Crook, Black Dog | VS 4c * | 2nd O/S | 1 Apr, 1983 | Zennor Cliff | |||
Sexilegs | HVS 5b ** | 2nd rpt | 19 Mar, 1983 | Baggy Point | |||
Long Rock Eliminate | HVS 5a * | Lead O/S | 19 Mar, 1983 | Baggy Point | |||
Mourning Glory | VS | AltLd | 5 Mar, 1983 | Cheddar Gorge South | |||
Jill | S 4a | AltLd | 5 Mar, 1983 | Cheddar Gorge South | |||
Resurrection | HS 4b * | Lead O/S | 23 Jan, 1983 | Cattle Troughs | |||
Consolation | HS 4a | Lead O/S | 23 Jan, 1983 | Cattle Troughs | |||
Chockney | VD 4a * | Lead O/S | 23 Jan, 1983 | Cattle Troughs | |||
Gangway | VD | Lead O/S | 28 Nov, 1982 | Spekes Mill Mouth and... | |||
Silk | S 4a | Lead O/S | 27 Nov, 1982 | Foxhold Slabs | |||
Mozambique | VS 4c * | Lead O/S | 27 Nov, 1982 | Foxhold Slabs | |||
Quarter Deck | VD | Solo O/S | 27 Nov, 1982 | Higher Sharpnose Point | |||
Bubbly | VD | Solo O/S | 27 Nov, 1982 | Higher Sharpnose Point | |||
M1 | E1 5b ** | 2nd O/S | 13 Nov, 1982 | Avon Gorge (Sea Walls Area) |