showing 1-25
UKH
Name Grade Style Date Crag name
Route 2 6a ** 2nd 14/Jun/15 Castle Inn Quarry
Cakewalk Direct 6c ** 2nd 14/Jun/15 Castle Inn Quarry
Route 1 5a *** 2nd O/S 14/Jun/15 Castle Inn Quarry
Ramp Central V2 Sent 13/Jun/15 Cromlech boulders
Snakes And Ladders (and Tunnels) HVS 2nd O/S 13/Jun/15 California
Diagonal HVS 5a *** 2nd O/S 12/Jun/15 Dinas Mot
Scare City E6 6a ** TR 11/Jun/15 Bus Stop Quarry
P5 V3 ** Sent 11/Jun/15 Caseg Fraith Boulder
P7 V2 ** Sent 11/Jun/15 Caseg Fraith Boulder
P4 V3 * Sent 11/Jun/15 Caseg Fraith Boulder
Bise-Mon-Cul E2 5c ** 2nd O/S 11/Jun/15 Australia
1000 Tons of Chicken Shit E5 6a * 2nd dog 11/Jun/15 Bus Stop Quarry
Grendel E2 5c * 2nd 10/Jun/15 Holyhead Mountain
Breaking the Barrier E1 5b *** 2nd O/S 10/Jun/15 Holyhead Mountain
North West Passage E1 5b *** 2nd 10/Jun/15 Gogarth South Stack
Continuation Crack HVS 5a ** 2nd RP 09/Jun/15 Idwal Slabs (aka Cwm Idwal)
Javelin Blade E1 5b ** 2nd O/S 09/Jun/15 Idwal Slabs (aka Cwm Idwal)
Hope VD *** 2nd O/S 09/Jun/15 Idwal Slabs (aka Cwm Idwal)
Superdirect HVS 5a *** AltLd dnf 08/Jun/15 Milestone Buttress
Overhanging Arete f6A * Sent 26/May/15 Slipstones
Flaky Wall f5 Sent x 26/May/15 Slipstones
Slanting Flake f3+ ** Sent O/S 26/May/15 Slipstones
Slanting Flake -LH f5+ * Sent O/S 26/May/15 Slipstones
Chockstone Pull Up D Solo 26/May/15 Slipstones
Tiptoe f5 ** Sent x 26/May/15 Slipstones