Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Comes the Seth | HVS 5a | 2nd | 4 Sep, 2012 | Fairy Cave Quarry | |||
Balch's Slide | HS 4a * | 2nd | 4 Sep, 2012 | Fairy Cave Quarry | |||
Equals Not | VS 4b | 2nd | 4 Sep, 2012 | Fairy Cave Quarry | |||
Back to Sandy Lane | VD | 2nd | 4 Sep, 2012 | Fairy Cave Quarry | |||
Owl Wall (P2) | HS 4a * | 2nd O/S | 19 Aug, 2012 | Pot Hole Quarry (Three... | |||
Mango | HS 4a * | 2nd O/S | 19 Aug, 2012 | Pot Hole Quarry (Three... |