Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Slow Strain | 6b | Lead O/S | nedr | 30 Aug, 2023 | Ratho Quarry | ||
The Grapes of Ratho | 6b+ ** | Lead O/S | nedr | 30 Aug, 2023 | Ratho Quarry | ||
Doubtless Wall | S * | Lead O/S | 7 Jun, 2023 | Cummingston | |||
Flying Groove | VS 4c * | Lead O/S | 7 Jun, 2023 | Cummingston | |||
Snotty Nose | D | Lead O/S | 7 Jun, 2023 | Cummingston | |||
Sunshine Roof | HS * | Lead O/S | 7 Jun, 2023 | Cummingston | |||
The Lum | VD | Lead O/S | 6 Jun, 2023 | Cummingston | |||
Rice Crispie Wall | D * | Lead O/S | 6 Jun, 2023 | Cummingston | |||
Flying Buttress, Left Side | VD | Lead O/S | 6 Jun, 2023 | Cummingston | |||
Sunshine Groove | S | Lead O/S | 6 Jun, 2023 | Cummingston | |||
Drizzle | S | Lead O/S | 3 Jun, 2023 | Rosyth Quarry | |||
C.N.D. | S * | Lead O/S | 3 Jun, 2023 | Rosyth Quarry | |||
Jack's Route | VD | Lead O/S | 3 Jun, 2023 | Rosyth Quarry | |||
Smith's Dilemma | D * | Lead O/S | 3 Jun, 2023 | Rosyth Quarry | |||
Andy's Route | VD | Lead O/S | 3 Jun, 2023 | Rosyth Quarry | |||
C.N.D. | S * | Lead O/S | nedr | 1 May, 2023 | Rosyth Quarry | ||
Cathy | VS 4c ** | Lead O/S | nedr | 1 May, 2023 | Rosyth Quarry | ||
Red Flag | HS 4c * | Lead O/S | nedr | 23 Apr, 2023 | Limekilns | ||
White Ensign | VS 4c ** | Lead O/S | nedr | 23 Apr, 2023 | Limekilns | ||
Humbug | HS 4b * | 2nd | 23 Apr, 2023 | Limekilns | |||
Dead Ringer | E1 5b ** | 2nd O/S | 23 Apr, 2023 | Limekilns | |||
Fuck Face | HVS ** | AltLd | 20 Mar, 2022 | Dunkeld, Cave Crag | |||
Squirm | E1 5b * | 2nd | 20 Mar, 2022 | Dunkeld, Cave Crag | |||
Tombstone | E2 5c ** | 2nd | 20 Mar, 2022 | Dunkeld, Cave Crag | |||
The Ramp | HS * | 2nd | 20 Mar, 2022 | Dunkeld, Cave Crag |