Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Aries | HS 4b * | Lead O/S | 30 Aug, 2010 | Stanage North | |||
Nailbite | VD * | Lead O/S | 29 Aug, 2010 | Ilkley (Cow and Calf) | |||
The Flake Climb | S 4a *** | Lead O/S | 29 Aug, 2010 | Ilkley (Rocky Valley) | |||
Three Slabs Route | S 4a ** | Lead O/S | 29 Aug, 2010 | Ilkley (Rocky Valley) | |||
Stew Pot | HVD * | 2nd O/S | 28 Aug, 2010 | Almscliff | |||
Fluted Columns | HVD 3c *** | Lead O/S | 28 Aug, 2010 | Almscliff | |||
West Hill Arete | VD * | Lead O/S | 15 Apr, 2010 | Brassington (Rainster Rocks) | |||
Face Direct | VS 4c | Lead O/S | 15 Apr, 2010 | Brassington (Rainster Rocks) | |||
Brassington Crack Face | HS 4b | Lead O/S | 15 Apr, 2010 | Brassington (Rainster Rocks) | |||
Face Climb Number 2 | VD | Lead O/S | 15 Apr, 2010 | Brassington (Rainster Rocks) | |||
Face Climb Number 1 | D | Lead O/S | 15 Apr, 2010 | Brassington (Rainster Rocks) | |||
High Neb Buttress | VS 4c *** | Lead O/S | 31 Aug, 2009 | Stanage North | |||
Tango Buttress | HS 5a ** | Lead O/S | 31 Aug, 2009 | Stanage North | |||
Inaccessible Crack Direct | VS 4c ** | Lead O/S | 31 Aug, 2009 | Stanage North | |||
Razor Rib | HVD ** | Lead O/S | Aug, 2009 | Scugdale - Scot Crags | |||
Bonzo | HVS 5b ** | Lead O/S | Aug, 2009 | Scugdale - Scot Crags |