Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Ardgartan Arête | VS 4b ** | - | 2013 | The Cobbler | |||
Punster's Crack (Summer) | S *** | - | 2013 | The Cobbler | |||
Recess Route (Summer) | S *** | AltLd β | 2013 | The Cobbler | |||
North Face Route | S * | - | 2013 | Buachaille Etive Mor | |||
The Long Crack | S ** | - | 2013 | Aonach Dubh | |||
Archer Ridge | S 4a *** | - | 2013 | Aonach Dubh | |||
Cioch Nose | VD *** | - | 2013 | Sgurr a' Chaorachain | |||
Integrity | VS 4c *** | - | 2013 | Sron na Ciche | |||
Terrace Crack | HS 4b ** | Lead O/S | 26 Aug, 2012 | Froggatt Edge | |||
Valkyrie | HVS 5a *** | 2nd | 26 Aug, 2012 | Froggatt Edge | |||
Three Pebble Slab | HVS 5a *** | Lead | 26 Aug, 2012 | Froggatt Edge | |||
Heather Wall | HVD 3b *** | Lead O/S | 26 Aug, 2012 | Froggatt Edge | |||
The Slant Start | HVD * | Lead O/S | 25 Aug, 2012 | Windgather Rocks | |||
Nose Direct | HVD ** | Lead O/S | 25 Aug, 2012 | Windgather Rocks | |||
Raven's Tower | VS 4b ** | 2nd | 15 Jul, 2012 | Crag Lough | |||
Tarzan | S 4a *** | Lead O/S | 15 Jul, 2012 | Crag Lough | |||
Pinnacle Face | VS 4c *** | 2nd | 15 Jul, 2012 | Crag Lough | |||
Bracket | VD ** | 2nd | 15 Jul, 2012 | Crag Lough | |||
Hadrian's Buttress | HS 4b *** | Lead O/S | 15 Jul, 2012 | Crag Lough | |||
Sunset | S 4a *** | Lead O/S | 27 May, 2012 | Peel crag | |||
Odysseus | S | 2nd | 27 May, 2012 | Peel crag | |||
Rock Island LIne | E1 5b *** | Lead dog | 27 May, 2012 | Peel crag | |||
Tiger's Overhang | VS 4c ** | 2nd | 27 May, 2012 | Peel crag | |||
Grooves | HS 4a ** | 2nd | 27 May, 2012 | Peel crag | |||
Scorpion | VS 4c ** | Lead O/S | 28 Apr, 2012 | Bowden Doors |