showing 1-25
Name Grade Style Date Crag name
Sleepy Hollow f6B+ - 31/Aug Doolin Boulders
Black Corner f6C Sent x 31/Aug Doolin Boulders
Big Foot f6A+ Sent β 31/Aug Doolin Boulders
The Egg f6A Sent x 31/Aug Doolin Boulders
Right Edge f5 Sent β 31/Aug Doolin Boulders
Sticker f5 Sent β 31/Aug Doolin Boulders
Problem 6 (Big Jim) f6A Sent β 28/Aug Glendalough Boulders
Problem 3 (Big Jim) f6B Sent x 28/Aug Glendalough Boulders
Smear test f5+ Sent x 28/Aug Glendalough Boulders
Buoys will be Buoys 6b+ *** Lead β 19/Aug Battleship Back Cliff
Pump Hitler 7a+ *** Lead RP 19/Aug Battleship Back Cliff
Nightmare Scenario 7c ** Lead RP 15/Aug The Cuttings
European Flavour 6b ** Lead β 15/Aug The Cuttings
Consommé 6a+ ** Lead RP 15/Aug The Cuttings
Jam 4c ** Lead RP 10/Aug The Cuttings
Too Many Cooks Spoil the Broth 6b ** Lead β 10/Aug The Cuttings
100 Sunny Days 3 Solo rpt 10/Aug The Cuttings
100 Sunny Days 3 Lead O/S 10/Aug The Cuttings
The Cutting Edge 6c+ *** Lead O/S 10/Aug The Cuttings
Dumbfounded 7b * Lead RP 10/Aug The Cuttings
Jurassic Shift 7a ** Lead RP 06/Aug Battleship Back Cliff
Split Lip f7A+ ** Sent x 05/Aug The Cuttings Boulderfield
Want Out 7b *** Lead RP 18/Jul The Cuttings
Two Fingers 6a ** Lead β 18/Jul The Cuttings
New Saladin 6c ** Lead β 18/Jul The Cuttings