Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Shallow Rib | VD * | Solo O/S | 14 Jun, 2010 | Baslow Edge | |||
Right-hand Gully | D | Solo O/S | 14 Jun, 2010 | Baslow Edge | |||
Gully Wall Variation | VD 4a | Solo O/S | 14 Jun, 2010 | Baslow Edge | |||
Gully Wall | M * | Solo O/S | 14 Jun, 2010 | Baslow Edge | |||
Route 3.5 | VD | Solo O/S | 14 Jun, 2010 | Baslow Edge | |||
Route 3 | VD | Solo O/S | 14 Jun, 2010 | Baslow Edge | |||
Route 2 | VD 4b * | Solo O/S | 14 Jun, 2010 | Baslow Edge | |||
Route 1.9 | S 4a | Solo O/S | 14 Jun, 2010 | Baslow Edge | |||
Route 1.5 | S 4b | Solo O/S | 14 Jun, 2010 | Baslow Edge | |||
Route 1 | VD * | Solo O/S | 14 Jun, 2010 | Baslow Edge | |||
Still Orange | S 4a * | Lead O/S | 2 Jun, 2010 | Burbage North | |||
Knight's Move | HVS 5a *** | 2nd O/S | 2 Jun, 2010 | Burbage North | |||
Hope | VD *** | AltLd O/S | 25 May, 2010 | Idwal Slabs (aka Cwm Idwal) | |||
Direct Route | HVD *** | 2nd O/S | 24 May, 2010 | Tryfan | |||
Hollybush Crack | VD *** | Lead O/S | 21 May, 2010 | Stanage Popular | |||
Christmas Pud | 4c | Lead O/S | 20 May, 2010 | Horseshoe Quarry | |||
Vogon | 6a | 2nd O/S | 20 May, 2010 | Horseshoe Quarry | |||
Camperdown Crawl | HS 4c ** | Lead RP | 19 May, 2010 | Birchen Edge | |||
Aged Crack | S 4a * | Lead O/S | 23 Mar, 2010 | Windgather Rocks | |||
Heather Face | HVD | Lead O/S | 23 Mar, 2010 | Windgather Rocks | |||
Nose Direct | HVD ** | Lead O/S | 23 Mar, 2010 | Windgather Rocks | |||
Centre Route | S 4a * | Lead O/S | 16 Mar, 2010 | Windgather Rocks | |||
Chockstone Chimney | D * | Solo O/S | 16 Mar, 2010 | Windgather Rocks | |||
Portfolio | HVS 5a * | 2nd O/S | 16 Mar, 2010 | Windgather Rocks | |||
The Medicine | S 4a * | Lead O/S | 16 Mar, 2010 | Windgather Rocks |