Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Vallis crack | VS 4c * | Lead rpt | pins | 23 May, 2009 | Vallis Vale | ||
Gift Tolkien | S 4a | Lead RP | pins | 10 May, 2009 | Goblin Combe | ||
The Gnome King | HS 4b * | Lead RP | pins | 10 May, 2009 | Goblin Combe | ||
Swinging In The Breeze | 4a | Lead O/S | georgie | 2 May, 2009 | The Holcombe Quarries | ||
Lego Man | 3c ** | Lead O/S | pins | 2 May, 2009 | The Holcombe Quarries | ||
Real Men Do Eat Quiche | S 4a * | AltLd | colin milton | 13 Apr, 2009 | Fairy Cave Quarry | ||
Lunar Landscape | VS 4b * | AltLd | colin milton | 13 Apr, 2009 | Fairy Cave Quarry | ||
Halfway to Kansas | HS 4a | AltLd | colin milton | 13 Apr, 2009 | Fairy Cave Quarry | ||
Balch's Slide | HS 4a * | AltLd | colin milton | 13 Apr, 2009 | Fairy Cave Quarry | ||
The Alpine Ridge | M | AltLd | colin milton | 13 Apr, 2009 | Fairy Cave Quarry | ||
Rob's Crack | VS 4c *** | AltLd | colin milton | 13 Apr, 2009 | Fairy Cave Quarry | ||
Little Steve's Mersey Tunnel Affair | S 4a | Lead O/S | pins | 5 Apr, 2009 | Fairy Cave Quarry | ||
Long Time Coming | 4a | Lead rpt | pins | 22 Mar, 2009 | The Holcombe Quarries | ||
Moderately Green | 4a | Lead rpt | pins | 22 Mar, 2009 | The Holcombe Quarries | ||
Vallis crack | VS 4c * | Lead rpt | Spatch | Sep, 2008 | Vallis Vale | ||
Bramble Whine | VS 4c * | Lead rpt | Colin Charles | 2007 | Fairy Cave Quarry | ||
Withy Crack | HVS 5a ** | 2nd | Colin Charles | 2007 | Fairy Cave Quarry | ||
Smell the Glove | E1 5b * | 2nd | Colin Charles | 2007 | Fairy Cave Quarry | ||
Tiptoe (aka The shield of Achilles) | E3 5b | TR | Colin Charles | 2007 | Vallis Vale | ||
Pippin | HVS 5b * | Lead O/S | Colin Charles | 2007 | Goblin Combe | ||
Gondolin | VS 4c ** | Lead O/S | Colin Charles | 2007 | Goblin Combe |