Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Keep Arête | VS 4b ** | TR | Andy Beech | 11 May, 2010 | Castle Naze | ||
Nozag | VS 4c *** | 2nd | Andy Beech | 11 May, 2010 | Castle Naze | ||
Triangle Buttress Direct | S 4a * | Lead | Andy Beech | 9 Apr, 2010 | Burbage North | ||
Overhanging Buttress Arête | M * | Solo | 9 Apr, 2010 | Burbage North | |||
Big Chimney Arête | HS 4b * | Lead | Andy Beech | 9 Apr, 2010 | Burbage North | ||
Ash Tree Crack | VD * | 2nd | Andy Beech | 9 Apr, 2010 | Burbage North | ||
Studio | HS 4b ** | Lead | 2010 | Castle Naze | |||
Condor Slab | VS 4c ** | TR | 2010 | Roaches Skyline | |||
Heather Wall | HVD 3b *** | Lead | Andy Beech | 28 Oct, 2009 | Froggatt Edge | ||
Trapeze Direct | VS 4c * | Lead | Andy Beech | 28 Oct, 2009 | Froggatt Edge | ||
Sunset Crack | HS 4b ** | Lead | 28 Oct, 2009 | Froggatt Edge | |||
Trafalgar Crack | VD 4a * | Lead | 23 Sep, 2009 | Birchen Edge | |||
Porthole Direct | VS 4c ** | 2nd | 23 Sep, 2009 | Birchen Edge | |||
Topsail | VS 4c ** | 2nd | 23 Sep, 2009 | Birchen Edge | |||
Emma's Dilemma | S 4a * | Lead | 23 Sep, 2009 | Birchen Edge | |||
The Niche | S 4a ** | 2nd | 15 Sep, 2009 | Castle Naze | |||
Keep Corner | S 4a * | Lead | 15 Sep, 2009 | Castle Naze | |||
The Crack | VS 4b ** | 2nd | 15 Sep, 2009 | Castle Naze | |||
Corner Crack | VD * | 2nd | 2009 | Windgather Rocks | |||
Nose Direct | HVD ** | Lead | 2009 | Windgather Rocks | |||
Toe Nail | VD * | Lead | 2009 | Windgather Rocks | |||
Amazon Crack | S 4a ** | Lead | 2009 | Stanage Popular | |||
Heaven Crack | VD *** | Lead | 2009 | Stanage Popular | |||
Inverted V | VS 4b *** | 2nd | 2009 | Stanage Popular | |||
Left-hand Route | S 4b ** | Lead dnf | 2009 | Roaches Upper Tier |