Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Cristallo | VS 4b * | TR | andy007 | 20 Apr, 2015 | Pot Hole Quarry (Three... | ||
Murren | HS 4b * | TR | andy007 | 20 Apr, 2015 | Pot Hole Quarry (Three... | ||
Sesto | HVD * | TR rpt | andy007 | 20 Apr, 2015 | Pot Hole Quarry (Three... | ||
Mestre | S 4a | TR rpt | andy007 | 20 Apr, 2015 | Pot Hole Quarry (Three... | ||
Selva | VS 4a | TR rpt | andy007 | 20 Apr, 2015 | Pot Hole Quarry (Three... | ||
Crack 2 | D * | AltLd O/S | andy007 | 14 Apr, 2015 | Tryfan Fach [Little Tryfan] | ||
Crack 4 | D * | AltLd O/S | andy007 | 14 Apr, 2015 | Tryfan Fach [Little Tryfan] | ||
Slab 1 | VD * | AltLd O/S | andy007 | 14 Apr, 2015 | Tryfan Fach [Little Tryfan] | ||
Little Tryfan Arete | D ** | AltLd O/S | andy007 | 14 Apr, 2015 | Tryfan Fach [Little Tryfan] | ||
Pride | VD | 2nd O/S | andy007 | 30 Sep, 2013 | Twilight Area | ||
Sloth | VD * | Lead O/S | andy007 | 30 Sep, 2013 | Twilight Area | ||
Main Wall | HS 4b *** | - | 2013 | Cyrn Las (Gyrn Las) | |||
Valkyrie | HVS 5a *** | - | 2013 | Froggatt Edge | |||
Three Pebble Slab | HVS 5a *** | - | 2013 | Froggatt Edge | |||
Great North Road | HVS 5a *** | Lead RP | 2013 | Millstone Edge | |||
Grooved Arête | HVD 4a *** | - | 2013 | Tryfan | |||
Valkyrie | VS 4c *** | - | 2013 | Roaches Lower Tier | |||
Valkyrie | HVS 5a *** | - | 2013 | Froggatt Edge | |||
Doorpost | HS 4b *** | Lead | 2013 | Bosigran | |||
Terrier's Tooth (pre-2014) | HS 4a *** | Lead | 2013 | Chair Ladder | |||
Demo Route | HS 4b *** | Lead | 2013 | Sennen | |||
Technical Slab | HS 4a *** | Lead | 2013 | Roaches Upper Tier | |||
Via Dolorosa | VS 4c *** | Lead | 2013 | Roaches Lower Tier | |||
K2 | S 4b ** | Lead | 2013 | Hen Cloud | |||
Central Climb | VS 4c *** | Lead | 2013 | Hen Cloud |