showing 1-25
UKH
Name Grade Style Date Crag name
Rapunzle VS 5a ** 2nd 15 Aug, 2013 Troy Quarry
Stacked Deck HS 4b ** 2nd 15 Aug, 2013 Troy Quarry
Malvinas HS 4b * 2nd 13 Aug, 2013 Egerton Quarry
Starters VD Lead O/S 6 Aug, 2013 Summit Quarry
April Crack HS 4b *** 2nd 1 Aug, 2013 Stanage Popular
Disorder HS 4a ** 2nd ?Aug, 2013 Summit Quarry
Mo HS 4b ** 2nd 20 Jul, 2013 Wilton 3
Rappel Wall VD ** 2nd 20 Jul, 2013 Wilton 3
Crack and Slab Variant VD * 2nd 20 Jul, 2013 Wilton 3
Mo HS 4b ** 2nd 19 Jul, 2013 Wilton 3
Rappel Wall VD ** Lead O/S 19 Jul, 2013 Wilton 3
40ft Corner VS 4b * 2nd 19 Jul, 2013 Wilton 3
Crack and Slab Variant VD * Lead 19 Jul, 2013 Wilton 3
Slime Chimney HVD * 2nd 19 Jul, 2013 Wilton 3
Chimney Route VD Lead O/S 9 Jul, 2013 Cow's Mouth Quarry
Sandy Crack VS 5a 2nd 9 Jul, 2013 Cow's Mouth Quarry
Groovin' HS 4b Lead 9 Jul, 2013 Cow's Mouth Quarry
Right Siamese Twin S 4a Lead O/S 6 Jul, 2013 Troy Quarry
Left Siamese Twin S 4a Lead O/S 6 Jul, 2013 Troy Quarry
Left Siamese Twin S 4a Lead O/S 6 Jul, 2013 Troy Quarry
The Shroud VS 4c ** 2nd 24 Jun, 2013 Black Crag (Borrowdale)
The Shroud VS 4c ** 2nd 24 Jun, 2013 Black Crag (Borrowdale)
Troutdale Pinnacle S *** 2nd 24 Jun, 2013 Black Crag (Borrowdale)
The Crab VS 4c * 2nd 8 Jun, 2013 Summit Quarry
Free Spirit E2 5b 2nd 8 Jun, 2013 Summit Quarry