showing 1-25
Name Grade Style Date Crag name
Pale Rider 6a * Lead O/S 28 Jul, 2013 Horseshoe Quarry
Excavator 5c * Lead O/S 28 Jul, 2013 Horseshoe Quarry
Keep Corner S 4a * 2nd 14 Jul, 2013 Castle Naze
Nozag VS 4c *** Lead O/S 14 Jul, 2013 Castle Naze
No Name S 4b 2nd O/S 14 Jul, 2013 Castle Naze
Scoop Face HVS 5a *** Lead O/S 14 Jul, 2013 Castle Naze
Thin Crack VS 5a 2nd O/S 14 Jul, 2013 Castle Naze
Sheltered Crack VD * Solo O/S 14 Jul, 2013 Castle Naze
Pinnacle Arete VD Solo O/S 14 Jul, 2013 Castle Naze
The Arete HS 4b * Solo O/S 14 Jul, 2013 Castle Naze
Double Crack D * Solo O/S 14 Jul, 2013 Castle Naze
Dirl Chimney VS 4c *** Lead O/S 30 Apr, 2011 Clifton Crag
Wall Street E1 5b *** Lead RP 30 Apr, 2011 Clifton Crag
Hope VD *** AltLd 22 Mar, 2011 Idwal Slabs (aka Cwm Idwal)
Direct Route VD *** AltLd 21 Mar, 2011 Milestone Buttress
Rowan Route D ** AltLd 21 Mar, 2011 Milestone Buttress
Foghorn Groove VS 4c * Solo O/S 5 Jun, 2010 Hobson Moor Quarry
The Harp HS 4b * Solo O/S 5 Jun, 2010 Hobson Moor Quarry
Sea Route VS 4c * Lead O/S 23 May, 2010 Dovestones Edge
Central Tower VD ** Lead O/S 23 May, 2010 Dovestones Edge
Manchester Buttress HS 4b *** 2nd 24 Apr, 2010 Stanage Popular
Garden Wall S 4a * 2nd 24 Apr, 2010 Stanage Popular
Leaning Buttress Direct HVS 5b ** Lead O/S 24 Apr, 2010 Stanage Popular
Queersville HVS 5a *** Lead O/S 24 Apr, 2010 Stanage Popular
Stirrup S 4a * 2nd 10 Apr, 2010 Dovestones Edge