showing 1-25
Name Grade Style Date Crag name
Central Buttress Direct E1 5a * 2nd 2 Sep, 2010 Black Rocks
Stonnis Crack HS 4b ** Lead 2 Sep, 2010 Black Rocks
Lone Tree Groove VS 5a ** Lead 2 Sep, 2010 Black Rocks
Amethyst VS 4c * Lead 1 Sep, 2010 Curbar Edge
Slab Recess D ** Solo 1 Sep, 2010 Froggatt Edge
Slab Recess Direct HS 4c * Lead 1 Sep, 2010 Froggatt Edge
Trapeze Direct VS 4c * Lead 1 Sep, 2010 Froggatt Edge
Tody's Wall HVS 5a *** 2nd 1 Sep, 2010 Froggatt Edge
Sunset Slab HVS 4b *** TR 1 Sep, 2010 Froggatt Edge
Sunset Crack HS 4b ** Lead 1 Sep, 2010 Froggatt Edge
Ash Tree Wall S 4a ** 2nd 31 Aug, 2010 Burbage North
Greeny Crack VS 4b ** Lead 31 Aug, 2010 Burbage North
Moss Side HS 4b * Lead 31 Aug, 2010 Rivelin Edge
Gardener's Pleasure HS 4b * Lead 31 Aug, 2010 Rivelin Edge
Pious Flake S 4b * 2nd 31 Aug, 2010 Rivelin Edge
Left Edge VS 4c ** Lead 31 Aug, 2010 Rivelin Edge
Aphid's Wall E1 5a * TR 30 Aug, 2010 Yarncliffe
Ant's Crack S 4a * Lead 30 Aug, 2010 Yarncliffe
Ant's Wall HS 4a ** 2nd 30 Aug, 2010 Yarncliffe
Latecomer HS 4b * Lead 30 Aug, 2010 Yarncliffe
Robin Hood's Crack HVD 4a ** Lead 30 Aug, 2010 Stanage Popular
The Confectioner VS 5a * 2nd 30 Aug, 2010 Stanage Popular
Dieppe S 4b Lead 30 Aug, 2010 Stanage Popular
Dover's Wall, Route 4 VS 4b * 2nd 30 Aug, 2010 Stanage Popular
Dover's Wall, Route 3 VS 4c * 2nd 30 Aug, 2010 Stanage Popular