showing 1-25
Name Grade Style Date Crag name
Control 6c 5c ** TR dnf 13 May, 2015 Stone Farm
Remote 4c 4c * TR O/S 13 May, 2015 Stone Farm
Belle Vue Terrace 6c 6a *** TR dnf 12 Sep, 2014 Stone Farm
Key Wall 6a+ 5a *** TR β 12 Sep, 2014 Stone Farm
Stone Farm Crack 4b 4b ** TR O/S 12 Sep, 2014 Stone Farm
Primitive Groove 4b 4b * Solo O/S 12 Sep, 2014 Stone Farm
SE Corner Crack 4b 4b ** Solo O/S 12 Sep, 2014 Stone Farm
Slab 5c 5a * TR rpt 10 Jun, 2014 Harrisons Rocks
Slab Direct 6a+ 5b ** TR dnf 10 Jun, 2014 Harrisons Rocks
Starlight 5a 4c ** TR rpt 10 Jun, 2014 Harrisons Rocks
Moonlight Arete 5a 4c *** TR rpt 10 Jun, 2014 Harrisons Rocks
The Niblick 6b 5b *** TR O/S 10 Jun, 2014 Harrisons Rocks
Slab Direct 6a+ 5b ** Solo β 2 Apr, 2013 Harrisons Rocks
Ok Corral f2+ * Sent β 2 Apr, 2013 Harrisons Rocks
West Face Route f5+ ** Sent β 2 Apr, 2013 Harrisons Rocks
torque wrench f6A+ ** Sent dnf 2 Apr, 2013 Harrisons Rocks
Layaway Cure f5+ * Sent β 2 Apr, 2013 Harrisons Rocks
Sunset Wall f5 * Sent O/S 2 Apr, 2013 Harrisons Rocks
letterbox f5 ** Sent O/S 2 Apr, 2013 Harrisons Rocks
Split Lip, Lip Start f6B+ * Sent β 4 Mar, 2013 The Cuttings Boulderfield
Trout Pout f6B * Sent O/S 4 Mar, 2013 The Cuttings Boulderfield
The Arête f6A * Sent O/S 4 Mar, 2013 The Cuttings Boulderfield
The Crack f4+ ** Sent O/S 4 Mar, 2013 The Cuttings Boulderfield
Warm-up Arête Right f4+ Sent O/S 4 Mar, 2013 The Cuttings Boulderfield
Warm-up Arête Left f4 Sent O/S 4 Mar, 2013 The Cuttings Boulderfield