showing 101-125
UKH
Name Grade Style Date Crag name
Route 1 5a *** Lead O/S 10 Mar, 2012 Castle Inn Quarry
Route 3 6c *** Lead RP 10 Mar, 2012 Castle Inn Quarry
Indian summer 6a+ * Lead O/S 10 Mar, 2012 Castle Inn Quarry
Stonnis Crack HS 4b ** 2nd O/S 30 Nov, 2011 Black Rocks
Birch Tree Wall VS 4c *** Lead O/S 30 Nov, 2011 Black Rocks
Birch Tree Wall Variations HVS 5a ** 2nd O/S 30 Nov, 2011 Black Rocks
Motorcade E1 5a ** Lead O/S 23 Nov, 2011 Froggatt Edge
Tody's Wall HVS 5a *** Lead O/S 23 Nov, 2011 Froggatt Edge
Heather Wall HVD 3c *** 2nd O/S 23 Nov, 2011 Froggatt Edge
Knight's Move HVS 5a *** 2nd O/S 23 Nov, 2011 Burbage North
Still Orange S 4a * Solo O/S 23 Nov, 2011 Burbage North
Pickpocket VS 4c * 2nd O/S 23 Nov, 2011 Burbage North
Agnostic's ArĂȘte VS 5a * Lead O/S 23 Nov, 2011 Burbage North
Present Arms HS 4c Solo O/S 23 Nov, 2011 Burbage North
Black Slab VS 4b * Solo O/S 23 Nov, 2011 Burbage North
Street Legal E2 5c * Lead O/S 19 Nov, 2011 Millstone Edge
Giant's Steps VD Solo O/S 19 Nov, 2011 Millstone Edge
Midrift VD Solo O/S 19 Nov, 2011 Millstone Edge
Juniper E1 5b Solo O/S 19 Nov, 2011 Millstone Edge
Hells Bells HS 4b * 2nd O/S 19 Nov, 2011 Millstone Edge
Chiming Cracks HS 4a * Lead O/S 19 Nov, 2011 Millstone Edge
Embankment 3 E1 5b *** 2nd O/S 19 Nov, 2011 Millstone Edge
Triangle Buttress Direct S 4a * 2nd O/S 30 Oct, 2011 Burbage North
... and Son D Solo O/S 30 Oct, 2011 Burbage North
Steptoe M * Solo O/S 30 Oct, 2011 Burbage North