showing 1-25
UKH
Name Grade Style Date Crag name
Grooved ArĂȘte HVD 4a *** Lead O/S 7 Jul Tryfan
Rowan Route D ** Lead O/S 6 Jul Milestone Buttress
Mossy Slab HVD * Lead O/S 6 Jul Tryfan Fach (Little Tryfan)
Crack 3 D * Lead O/S 6 Jul Tryfan Fach (Little Tryfan)
Crack 4 D * Lead O/S 5 Jul Tryfan Fach (Little Tryfan)
Chimney Crack M * Lead O/S 5 Jul Tryfan Fach (Little Tryfan)
Prow Cracks VD ** Lead rpt 23 Mar Roaches Lower Tier
Lighthouse VD Lead O/S 23 Mar Roaches Skyline
Maud's Garden HVD 3c *** Lead rpt 23 Mar Roaches Upper Tier
Heather Slab Groove D Lead O/S 23 Mar Roaches Upper Tier
Navy Cut VD Lead O/S 23 Mar Roaches Skyline
Time to be Had HVD * Lead rpt 23 Mar Roaches Skyline
Condor Chimney VD Lead O/S 23 Mar Roaches Skyline
Mantelshelf Route D * Lead O/S 22 Mar The Five Clouds
Lenin VD Lead O/S 22 Mar The Five Clouds
Stalin S 4a * Lead O/S 22 Mar The Five Clouds
The Roaches Ridge D 3a * Solo O/S 22 Mar Roaches Lower Tier
Rotunda Gully M Solo O/S 22 Mar Roaches Upper Tier
Flake Gully M Solo O/S 22 Mar Ramshaw Rocks
ArĂȘte and Crack VD ** Solo O/S 22 Mar Ramshaw Rocks
Bridget f4+ * Sent O/S 22 Mar Newstones and Baldstones
Up Chips f3 ** Sent O/S 21 Mar Roaches Lower Tier
Pine Crack f3 * Sent O/S 21 Mar Roaches Lower Tier
Sifta's Quid Inside Route S 3a Solo 21 Mar Roaches Lower Tier
Slab and Crack D * Lead O/S 17 Mar Froggatt Edge