showing 1-25
UKH
Name Grade Style Date Crag name
Bilberry Crack VD * 2nd O/S 28 Oct, 2019 Burbage North
Ash Tree Crack VD * Lead O/S 28 Oct, 2019 Burbage North
Ash Tree Wall S 4a ** Lead O/S 28 Oct, 2019 Burbage North
Wall Corner HVD 4a * 2nd O/S 28 Oct, 2019 Burbage North
Triangle Buttress Direct S 4a * Lead rpt 28 Oct, 2019 Burbage North
Baseless HVD * 2nd O/S 28 Oct, 2019 Burbage North
Route 3 S 4a * Lead O/S 28 Oct, 2019 Burbage North
Route 2 S 4a * 2nd O/S 28 Oct, 2019 Burbage North
High Buttress Arête D *** Lead rpt 27 Oct, 2019 Windgather Rocks
Director VS 4b * 2nd rpt 27 Oct, 2019 Windgather Rocks
Middle Buttress Arête VD * Lead O/S 27 Oct, 2019 Windgather Rocks
Centre Route S 4a * 2nd O/S 27 Oct, 2019 Windgather Rocks
Wall Climb HVD * Lead O/S 27 Oct, 2019 Windgather Rocks
Chimney and Crack VD * Lead O/S 27 Oct, 2019 Windgather Rocks
North Buttress Arête S 4a * 2nd O/S 27 Oct, 2019 Windgather Rocks
Puffing Billy HS 4b * 2nd O/S 12 Aug, 2019 Trevor Quarry
Thomas the Tank Engine S 4a * Lead O/S 12 Aug, 2019 Trevor Quarry
The Fat Controller S 4a * TR O/S 12 Aug, 2019 Trevor Quarry
Sloth VD * Lead O/S 12 Aug, 2019 Twilight Area
Pride VD 2nd O/S 12 Aug, 2019 Twilight Area
Helme's Highway S 4a Lead O/S 12 Aug, 2019 Twilight Area
A Leopard Cannot Change His Spots 2a Lead O/S 13 Jul, 2019 Foxhole
The Power Of The Leopard Skin Leg Warmers 3c * Lead O/S 13 Jul, 2019 Foxhole
Leopard Prints 4a * Lead O/S 13 Jul, 2019 Foxhole
Delta Minus D Lead O/S 13 Jul, 2019 Pennard