showing 276-300
Name Grade Style Date Crag name
Right Studio Climb VD 2nd 23 Apr, 2017 Burbage North
End Buttress D Lead O/S 23 Apr, 2017 Burbage North
Endest Arête VD 2nd 23 Apr, 2017 Burbage North
Front End Slab VD Lead O/S 23 Apr, 2017 Burbage North
Back End Slab D Lead O/S 23 Apr, 2017 Burbage North
End Slab Ramp D 2nd 23 Apr, 2017 Burbage North
U.F.O. S 4a * 2nd β 26 Mar, 2017 Curbar Edge
Flying Buttress Right S 4a * 2nd β 26 Mar, 2017 Curbar Edge
Grooved Arête VS 4c * 2nd dog 26 Mar, 2017 Curbar Edge
Short Measure D Lead O/S 26 Mar, 2017 Curbar Edge
Pillar Slab VD * Lead O/S 26 Mar, 2017 Curbar Edge
Cresent Slab f5+ * Sent 26 Mar, 2017 Curbar Edge
Diagonal f3+ * Sent 27 Dec, 2016 Curbar Edge
Side-wall Flake f5 * Sent 27 Dec, 2016 Curbar Edge
Side-wall Crack f4 * Sent 27 Dec, 2016 Curbar Edge
Side-wall Arête f4 * Sent 27 Dec, 2016 Curbar Edge
Bore-hole Crack f3+ Sent 27 Dec, 2016 Curbar Edge
Bore-hole Wall f3+ Sent 27 Dec, 2016 Curbar Edge
Oxine VS 4c *** AltLd G/U 11 Sep, 2016 Clogwyn y Wenallt
Nea VS 4b ** AltLd O/S 10 Sep, 2016 Clogwyn y Grochan
Crackstone Rib S 4a *** 2nd O/S 10 Sep, 2016 Carreg Wastad
Overlap Slab VD * 2nd O/S 28 Aug, 2016 Penally East
Central Corner VD * Lead O/S 28 Aug, 2016 Penally East
Wander Slab D * 2nd O/S 28 Aug, 2016 Penally East
Final Groove D * Lead O/S 27 Aug, 2016 Saddle Head