showing 1-25
UKH
Name Grade Style Date Crag name
Castle Crack HS 4b ** 2nd 22 Sep, 2009 Stanage Popular
Black Hawk Traverse Right D ** Lead rpt 22 Sep, 2009 Stanage Popular
The Y Crack VS 4c * 2nd 22 Sep, 2009 Stanage Popular
Black Hawk Traverse Left VD ** Lead rpt 22 Sep, 2009 Stanage Popular
Jack's Rake 1 *** Solo rpt 19 Sep, 2009 Pavey Ark
Bristly Ridge 1 *** - 9 Aug, 2009 Glyder Fach
Clogwyn y Person Arete 3 *** AltLd 8 Aug, 2009 Clogwyn y Ddysgl
The Parson's Nose D ** AltLd O/S 8 Aug, 2009 Clogwyn y Ddysgl
Gyrn Las 3 ** Solo 8 Aug, 2009 Cyrn Las (Gyrn Las)
Perambulator Parade VD ** 2nd 30 Jul, 2009 Newstones and Baldstones
The Witch D * Lead O/S 30 Jul, 2009 Newstones and Baldstones
Rhynose VS 4c * 2nd 30 Jul, 2009 Newstones and Baldstones
Baldstones Face VS 4b ** 2nd 30 Jul, 2009 Newstones and Baldstones
East Buttress (Summer) D *** AltLd O/S 10 Jul, 2009 Beinn Eighe
Lynx HS 4b *** 2nd 30 Jun, 2009 Wildcat
Jackdaw Grooves VS 4b ** 2nd 30 Jun, 2009 Wildcat
Route 1.5 S 4b 2nd 9 Jun, 2009 Baslow Edge
Broken Buttress VD Solo 9 Jun, 2009 Baslow Edge
Route 2 D 4a * Solo 9 Jun, 2009 Baslow Edge
Laicifitra 2 S 4a * 2nd 9 Jun, 2009 Baslow Edge
Cracked Wall HS 4a 2nd 9 Jun, 2009 Baslow Edge
Quarry Wall HS 4c * 2nd 9 Jun, 2009 Baslow Edge
Gully Wall Variation VD 4a Solo 9 Jun, 2009 Baslow Edge
Curbar Cracks D Lead O/S 9 Jun, 2009 Baslow Edge
Shallow Rib VD * Solo 9 Jun, 2009 Baslow Edge