showing 1-25
UKH
Name Grade Style Date Crag name
Derision Groove MVS 4b ** Lead O/S 2 Mar Shepherd’s Crag
Direct Route VD *** Lead O/S 17 Nov, 2018 Milestone Buttress
Slab Recess D ** Lead O/S 29 Sep, 2018 Froggatt Edge
Slab and Crack D * Lead O/S 29 Sep, 2018 Froggatt Edge
Solomon's Crack VD * Lead rpt 29 Sep, 2018 Froggatt Edge
Groove Above S 4b ** Lead dog 28 Aug, 2018 Idwal Slabs (aka Cwm Idwal)
Lazarus S 4a *** AltLd β 28 Aug, 2018 Idwal Slabs (aka Cwm Idwal)
Hope VD *** AltLd β 28 Aug, 2018 Idwal Slabs (aka Cwm Idwal)
Pillar Arête f5 * Sent dnf 19 Jul, 2018 Hobson Moor Quarry
Dragon's Slab f5 Sent β 19 Jul, 2018 Hobson Moor Quarry
Percy Right-hand f4+ * Sent dnf 19 Jul, 2018 Hobson Moor Quarry
Percy Left-hand f5+ * Sent dnf 19 Jul, 2018 Hobson Moor Quarry
Triangle Arête f5+ * Sent dnf 19 Jul, 2018 Hobson Moor Quarry
Slab Arête V0- Sent β 19 Jul, 2018 Hobson Moor Quarry
High Wall f4 Sent β 19 Jul, 2018 Hobson Moor Quarry
Edgy Slab f3 Sent β 19 Jul, 2018 Hobson Moor Quarry
Slippery Groove f3+ Sent β 19 Jul, 2018 Hobson Moor Quarry
Easy Crack f3 Sent β 19 Jul, 2018 Hobson Moor Quarry
Flakes f5 Sent β 19 Jul, 2018 Hobson Moor Quarry
The Seam f5 Sent β 19 Jul, 2018 Hobson Moor Quarry
Rib f5 * Sent β 19 Jul, 2018 Hobson Moor Quarry
Green Ramp f4 Sent β 19 Jul, 2018 Hobson Moor Quarry
Green Wall f3 * Sent β 19 Jul, 2018 Hobson Moor Quarry
Spider Chimney HVD 3c * 2nd β 12 Jul, 2018 Harborough Rocks
Pedestal Crack S 4a * 2nd O/S 12 Jul, 2018 Harborough Rocks