showing 1-25
UKH
Name Grade Style Date Crag name
The Great Ridge (Summer) D ** AltLd 8 Aug Garbh Bheinn
The Gutter D *** Lead O/S 8 Aug Polldubh Crags, Glen Nevis
Fairy Ring VD * Lead 5 Aug Meall an Fhir-Eoin
Fox VD * 2nd 5 Aug Meall an Fhir-Eoin
An Deireadh Direct Finish S 4b Lead 5 Aug Meall an Fhir-Eoin
An Toiseach VD * 2nd O/S 5 Aug Meall an Fhir-Eoin
Punster's Crack (Summer) S *** AltLd 3 Aug The Cobbler (Ben Arthur)
North Rib Route (Summer) HVD * Lead 3 Aug The Cobbler (Ben Arthur)
Stairs S 4a * 2nd 23 Jun Holyhead Mountain
Plimsole D * 2nd 23 Jun Holyhead Mountain
Curving Crack VS 4c ** Lead dnf 4 May Bamford Edge
Neomis S 4b * Lead 17 Apr Upper Matlock Quarries
Central Wall HD * 2nd 17 Apr Upper Matlock Quarries
Mantel Crack VS 4c 2nd 17 Apr Upper Matlock Quarries
Trident Face VD * 2nd 3 Apr Harborough Rocks
Trident Eliminate HS 4b * Lead 3 Apr Harborough Rocks
Crib Goch - Crib Y Ddysgl Traverse (Summer) 1 ** Solo 2 Jan Crib Goch
Crib Y Ddysgl - Crib Goch Traverse (Summer) 1 *** Solo 2 Jan Crib Goch
Y Grib Fach Goch M Solo 2 Jan Caban Coch/ Craig Gigfran
Strans Gill 2 *** Solo O/S 1 Nov, 2018 Strans gill
Bamford Wall S 4a ** 2nd 30 Sep, 2018 Bamford Edge
Bamford Buttress S 4a * Lead 30 Sep, 2018 Bamford Edge
Bracken Crack VD * Solo 30 Sep, 2018 Bamford Edge
K Buttress Slab VD * Solo 30 Sep, 2018 Bamford Edge
Que? Slab Direct/K Buttress Slab Direct D * Solo 30 Sep, 2018 Bamford Edge