showing 1-25
Name Grade Style Date Crag name
Rowan Route D ** Lead rpt 14 Sep Milestone Buttress
Rowan Route D ** Lead rpt 14 Sep Milestone Buttress
Kukri Crack HVD * TR O/S 31 Aug Wilton 2
Pinnacle Rib Route D *** AltLd O/S 27 Jul Tryfan
The Groove VD * Lead O/S 4 Jul Wilton 3
Rappel Wall VD ** 2nd O/S 4 Jul Wilton 3
Little Chamonix VD *** Lead O/S 15 Jun Shepherd’s Crag
Crack 3 D ** Lead O/S 27 May Barmouth Slabs
Block Crack D Solo O/S 26 May Barmouth Slabs
Crack 4 D ** Lead O/S 26 May Barmouth Slabs
Cyfrwy Arête (Summer) D *** Lead O/S 25 May Cader Idris (Cyfrwy)
Cyfrwy by the Table Direct VD *** Lead O/S 25 May Cader Idris (Cyfrwy)
Right of Puto Cable 5b * 2nd O/S 9 May Desplomilandia
Pingo 5a ** Lead O/S 9 May Desplomilandia
Aldebarán 5a * Lead O/S 9 May Desplomilandia
Los lunnis 5b * Lead dog 8 May Frontales
Lluvia dorada 5a * Lead dog 8 May Frontales
Vas pisando huevos 5a * Lead O/S 8 May Frontales
Punto de salida 4a * Lead O/S 8 May Frontales
Sector Canada Access 4a * Lead O/S 8 May Frontales
Starter 4a * Lead O/S 8 May Frontales
Via Ferrata El Chorro VF3A *** Lead O/S 7 May Frontales
Las cosas de Lucas 5a Lead O/S 6 May Escalera Arabe
Los timbales 4a *** Lead O/S 6 May Escalera Arabe
King Line 3a * Lead O/S 6 May Escalera Arabe