Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
An Grianan | D | Lead O/S | 6 Oct, 2019 | Barnbawn (The Rock of... | |||
Le Taureau Brun de Cooley | S 4b | Lead O/S | 6 Oct, 2019 | Barnbawn (The Rock of... | |||
Lineker | VS 4b * | Lead dog | 6 Oct, 2019 | Barnbawn (The Rock of... | |||
Expectancy | VD 3c *** | Lead O/S | 5 Oct, 2019 | Glendalough (Ireland) | |||
The Electric Bagpipe | VS 5a *** | TR O/S | 2019 | Kilt Rock, Staffin | |||
Right Wall - Styx Buttress | VD * | Lead O/S | 2019 | Polldubh Crags, Glen Nevis | |||
Damnation | VS 4c ** | Lead O/S | 2019 | Polldubh Crags, Glen Nevis | |||
Resurrection | VS 4c *** | Lead O/S | 2019 | Polldubh Crags, Glen Nevis | |||
The Gutter | D *** | Lead O/S | 2019 | Polldubh Crags, Glen Nevis | |||
Pine Wall | HS *** | Lead O/S | 2019 | Polldubh Crags, Glen Nevis |