Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Burgess Street | D | Lead O/S | Jo Bowes | Jun, 2011 | Burbage North | ||
Burgess Buttress | D | Lead O/S | Jo Bowes | Jun, 2011 | Burbage North | ||
Overhanging Buttress Arête | M * | Lead O/S | Jo Bowes | Jun, 2011 | Burbage North | ||
Overhanging Buttress Direct | S 4a * | Lead O/S | Jun, 2011 | Burbage North | |||
Trafalgar Crack | VD 4a * | Lead O/S | Jo Bowes | Jun, 2011 | Birchen Edge | ||
Porthole Buttress | S 4a * | Lead O/S | Jun, 2011 | Birchen Edge | |||
Nelson's Slab | HS 5a * | Lead O/S | Jun, 2011 | Birchen Edge | |||
Right Triplet Crack | S 4a | Lead O/S | Jo Bowes | Sep, 2010 | Windgather Rocks | ||
Director | VS 4b * | Lead O/S | Jo Bowes | Sep, 2010 | Windgather Rocks | ||
High Buttress Arête | D *** | Lead O/S | Jo Bowes | Sep, 2010 | Windgather Rocks | ||
Heather Face | HVD | Lead O/S | Sep, 2010 | Windgather Rocks | |||
Route 1 | HS 4a | Lead O/S | 2 Aug, 2009 | Windgather Rocks | |||
Editor's Note | VS 5a * | Lead O/S | 2 Aug, 2009 | Windgather Rocks | |||
Grooved Arête | HVD 4a *** | AltLd O/S | Aug, 2008 | Tryfan | |||
Christmas Crack | HS 4a *** | Lead O/S | Apr, 2008 | Stanage Popular | |||
April Crack | HS 4b *** | Lead O/S | Apr, 2008 | Stanage Popular |