Name Grade Style Date Crag name
First Up S 4a 2nd 26 Jul, 2009 Fairy Cave Quarry
Three Pounds Per Tonne 4a 2nd 1 Jan, 2009 Cheddar Gorge North
Ash Tree Wall VS 4c 2nd 28 Jun, 2008 Fairy Cave Quarry
Pueblo VD 2nd 28 Jun, 2008 Fairy Cave Quarry
Back to Basics VD * 2nd 7 Jun, 2008 Fairy Cave Quarry
Balch's Slide HS 4a * 2nd 7 Jun, 2008 Fairy Cave Quarry
Tethered by Gravity 4c * 2nd 8 Jun, 2006 Hedbury
Sea View 3a * 2nd 6 Jun, 2006 Hedbury
Another Contribution 2a * 2nd 6 Jun, 2006 Hedbury
Very Ordinary Route 1 * 2nd 6 Jun, 2006 Hedbury