Name Grade Style Date Crag name
Chips with Everything 5a * Lead β 9 Aug, 2009 The Cuttings
The Ramp 5a * Lead O/S 9 Aug, 2009 The Cuttings
Sleepwalk S 4a ** 2nd O/S 25 Jul, 2009 Avon Gorge (Sea Walls Area)
Dexter HS 4b * 2nd O/S 25 Jul, 2009 Avon Gorge (Main Area)
Right Crack f4 * Sent O/S 10 Jul, 2009 The New Cuttings
Deputy Donut f4+ * Sent O/S 10 Jul, 2009 The Cuttings Boulderfield
Canyon Crack f4+ Sent O/S 10 Jul, 2009 The New Cuttings
The Sod 5c * 2nd β 10 Jul, 2009 The Cuttings
The Arête f6A * Sent x 10 Jul, 2009 The Cuttings Boulderfield
torque wrench f6A+ ** Sent dnf ?Jun, 2009 Harrisons Rocks
Original Route 3c 3c Sent β ?Jun, 2009 Harrisons Rocks
Layaway Cure f5+ * Sent rpt ?Jun, 2009 Harrisons Rocks
Layaway Cure f5+ * Sent rpt ?Jun, 2009 Harrisons Rocks