Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Overlap Slab | HVD * | 2nd O/S | Stubs | 30 Aug, 2009 | Tryfan Fach [Little Tryfan] | ||
Crack 4 | D * | Lead O/S | Stubs | 30 Aug, 2009 | Tryfan Fach [Little Tryfan] | ||
Grooved ArĂȘte | HVD 4a *** | AltLd O/S | Stubs | 29 Aug, 2009 | Tryfan | ||
The Groove | VD * | Lead O/S | Stubs | 3 Jun, 2009 | Wilton 3 | ||
Parallel Cracks | S 4a ** | 2nd O/S | Stubs | 3 Jun, 2009 | Wilton 3 | ||
Orange Groove | VD * | Lead O/S | Stubs | 3 Jun, 2009 | Wilton 3 | ||
Aviemore Arete | S | Lead O/S | Stubs | 3 Jun, 2009 | Denham Quarry | ||
Flake Chimney | HVD * | 2nd O/S | Stubs | 2 Jun, 2009 | Stanage Popular | ||
Pedestal Chimney | D * | Lead O/S | Stubs | 2 Jun, 2009 | Stanage Popular | ||
Flying Buttress Gully | D | Lead O/S | Stubs | 2 Jun, 2009 | Stanage Popular | ||
Leaning Buttress Crack | VD ** | Lead O/S | Stubs | 2 Jun, 2009 | Stanage Popular | ||
Flying Buttress | HVD 4a *** | Lead O/S | Stubs | 2 Jun, 2009 | Stanage Popular | ||
Leaning Wall | S 4b | Lead dnf | Stubs | 2 Jun, 2009 | Burbage North | ||
Steptoe | M * | Solo | Stubs | 2 Jun, 2009 | Burbage North | ||
Triangle Crack | HVD 4a * | Lead O/S | Stubs | 2 Jun, 2009 | Burbage North | ||
Overlapping Ridge Route (First Pinnacle Rib) | D ** | AltLd O/S | Stubs | 31 May, 2009 | Tryfan | ||
Crack 2 | D * | AltLd O/S | Stubs | 30 May, 2009 | Tryfan Fach [Little Tryfan] | ||
Piton Route | VS 4c ** | AltLd O/S | Stubs | 30 May, 2009 | Idwal Slabs (aka Cwm Idwal) | ||
Hope | VD *** | AltLd O/S | Stubs | 30 May, 2009 | Idwal Slabs (aka Cwm Idwal) | ||
Crib Y Ddysgl - Crib Goch Traverse (Summer) | Grade-1 *** | Solo O/S | 3 Feb, 2009 | Crib Goch |