Name Grade Style Date Crag name
Constellation S ** Lead O/S 8 Apr, 2010 Meikle Partans
Jug Wall D * Lead O/S 7 Apr, 2010 Meikle Partans
The Bridge - Left Hand Variation VS 4c * 2nd O/S 7 Apr, 2010 Meikle Partans
Zeta VS 4b 2nd 17 Mar, 2010 The Long Slough
Twisted Crack HVS 5a * 2nd 17 Mar, 2010 The Long Slough
Brut VS 5a 2nd 10 Sep, 2009 Pass of Ballater
Stinker E1 5b ** TR 10 Sep, 2009 Pass of Ballater
Little Cenotaph HVS 5b ** 2nd 10 Sep, 2009 Pass of Ballater
Coral Sea VS 4c ** Lead O/S 26 Feb, 2009 Trowbarrow
Jean Jeanie VS 4c *** 2nd O/S 25 Feb, 2009 Trowbarrow
Biceps Wall MVS 4c 2nd O/S 23 Feb, 2009 Warton Small Quarry
The Leaning Tower VS 4c 2nd O/S 23 Feb, 2009 Warton Small Quarry
Country Boy HS 4a Lead O/S 23 Feb, 2009 Warton Small Quarry
Tower Arete S 4a Lead rpt 20 Feb, 2009 Fairy Steps
Tower Arete S 4a 2nd O/S 20 Feb, 2009 Fairy Steps
Tower Wall VS 4c 2nd O/S 20 Feb, 2009 Fairy Steps
Mabon S 4b ** Lead O/S 20 Feb, 2009 Fairy Steps
Prow Corner VD * Lead O/S 7 Feb, 2009 Roaches Lower Tier
Welly Boot Crack VS 4c 2nd O/S 28 Aug, 2008 Boltsheugh