showing 1-25
UKH
Name Grade Style Date Crag name
The Arete VD ** 2nd 2 Jul, 2011 Idwal Slabs (aka Cwm Idwal)
Lazarus S 4a *** 2nd 2 Jul, 2011 Idwal Slabs (aka Cwm Idwal)
Hope VD *** 2nd 2 Jul, 2011 Idwal Slabs (aka Cwm Idwal)
Blindfold HS 4a 2nd 27 Jun, 2011 Pot Hole Quarry (Three...
Mango HS 4a * 2nd 27 Jun, 2011 Pot Hole Quarry (Three...
The Snowdon Horseshoe (Summer) 1 *** - 30 Apr, 2011 Crib Goch
Staircase HVD 2nd 11 Apr, 2010 Castle Naze
Slanting Crack HVD 4a 2nd 11 Apr, 2010 Castle Naze
Sheltered Crack VD * 2nd 11 Apr, 2010 Castle Naze
Pinnacle Crack VD 2nd 11 Apr, 2010 Castle Naze
Right-hand Crack VD 2nd 11 Apr, 2010 Castle Naze
Easy Crack D 2nd 11 Apr, 2010 Castle Naze
Easy Corner D 2nd 11 Apr, 2010 Castle Naze
Double Crack D * 2nd 11 Apr, 2010 Castle Naze
Cyfrwy by the Table Direct VD *** 2nd 18 Oct, 2009 Cader Idris (Cyfrwy)
Cyfrwy Arête (Summer) D *** 2nd 18 Oct, 2009 Cader Idris (Cyfrwy)
Wall End Climb The Notch Variation S 4a * 2nd 23 Aug, 2009 Pontesford Rocks
Wall End climb VD * Lead 23 Aug, 2009 Pontesford Rocks
Rambler S 4a * 2nd 18 Aug, 2009 Maeshafn
Joker HVD 2nd 18 Aug, 2009 Maeshafn
Little Chamonix VD *** 2nd 9 Aug, 2009 Shepherd’s Crag
Corvus D *** 2nd 8 Aug, 2009 Raven Crag, Combe Ghyll
Ronson Kirkby VD 2nd 21 Jun, 2009 Hutton Roof Crags
Owl Wall (P2) HS 4a * 2nd 11 Jun, 2009 Pot Hole Quarry (Three...
Sesto HVD * 2nd 11 Jun, 2009 Pot Hole Quarry (Three...