Loading Notifications...
Showing UKC logbook as there wasn't any summits or scrambles ticked

470 entries in this logbook showing 1-25
Name Grade Style Partner(s) Notes Feedback Date Crag name
Original Route D 2nd O/S Euan Todd 24 Jun Avon Gorge (Main Area)
The Arête VD 4a ** AltLd Euan Todd 24 Jun Avon Gorge (Main Area)
The Corpse HVS 5a ** 2nd O/S Euan Todd 20 Jun Avon Gorge (Main Area)
Bon Bogies HVS 5a ** Lead O/S Euan Todd 20 Jun Avon Gorge (Main Area)
Lich Gates E2 5c *** AltLd O/S Euan Todd 20 Jun Avon Gorge (Main Area)
Mike's Mistake E1 5b ** 2nd β Euan Todd 15 Jun Avon Gorge (Main Area)
Pink Wall Traverse HVS 5a ** AltLd O/S Euan Todd 15 Jun Avon Gorge (Main Area)
Nightcap HVS 5b 2nd β Euan Todd 14 Jun Avon Gorge (Sea Walls Area)
Sleepwalk S 4a ** AltLd Euan Todd 14 Jun Avon Gorge (Sea Walls Area)
Ffoeg's Folly (P1) HVS 5a Lead Euan Todd 14 Jun Avon Gorge (Sea Walls Area)
Piton Route VS 4c ** AltLd O/S Euan Todd 9 Jun Avon Gorge (Main Area)
The Gnome King HS 4b * Lead O/S Euan Todd 6 Jun Goblin Combe
Shagrat E2 5b 2nd β Euan Todd 6 Jun Goblin Combe
Smaug The Dragon E1 5c ** 2nd β Euan Todd 6 Jun Goblin Combe
Bard the Bowman HS * Lead O/S Euan Todd 6 Jun Goblin Combe
Elrond VS 4c * Lead O/S Euan Todd 6 Jun Goblin Combe
Stranded S 2nd O/S Euan Todd, Digga 2 Jun Avon Gorge (Suspension Bridge...
Liverbird Buttress S AltLd O/S Digga, Euan Todd 2 Jun Avon Gorge (Suspension Bridge...
Gollum E1 5b * 2nd β Euan Todd 30 May Goblin Combe
Gondolin VS 4b * Lead O/S Euan Todd 30 May Goblin Combe
Bolg S 4a Lead O/S Euan Todd 30 May Goblin Combe
Hodge's Pin VS 4c * 2nd O/S Digga 27 May Avon Gorge (Suspension Bridge...
Rockers' Revenge VS 4c ** AltLd O/S Digga 27 May Avon Gorge (Suspension Bridge...
Sinister HS 4b ** 2nd O/S Euan Todd 24 May Avon Gorge (Main Area)
Dexter HS 4b * Lead rpt Euan Todd 24 May Avon Gorge (Main Area)