Climb name | Grade | Added | Crag name |
---|---|---|---|
Nijinski | E5 6a *** | 26 May | Auchinstarry Quarry |
Surface Tension | E5 6b *** | 26 May | Auchinstarry Quarry |
The Sorcerer (full route) | E1 5c *** | 28 Apr | Back Bowden Doors |
The Vole Right Hand SS | f7B+ ** | 28 Apr | Back Bowden Doors |
Leap of Faith | E6 6c * | 28 Apr | Back Bowden Doors |
Duke of York | E1 5b ** | 28 Apr | Back Bowden Doors |
Charlotte's Dream Direct | E7 6b ** | 28 Apr | Back Bowden Doors |
On the Rocks | E7 6c *** | 28 Apr | Back Bowden Doors |
Roof Route | E1 5b *** | 17 Mar | Back Bowden Doors |
Right of Reply | E5 6b *** | 17 Mar | Back Bowden Doors |
Low and Hard | f7B ** | 17 Mar | Back Bowden Doors |