2 pegs for aid. 4m left of Pigeon Toad, just right of a blank groove. Use 2 pegs for aid to gain a hold on the left, swing round on this and layback the 1st roof. Over the 2nd roof to a small ledge and finish direct.

Hank Pasquill 09/May/1968

datoon 27/Aug Lead O/S
with K
High E3
Mid E3
Low E3
High E2
Mid E2
Low E2
High E1
Mid E1
Low E1
High 6a
Mid 6a
Low 6a
High 5c
Mid 5c
Low 5c
High 5b
Mid 5b
Low 5b