showing 1-25
UKH
Name Grade Style Date Crag name
Bicycle Repair Man E1 5b ** Lead O/S 22/Sep Staden Main Quarry
Bimbo the Exploding Lorry Driver's Gulch Eliminate HS 4b * 2nd 22/Sep Staden Main Quarry
Joint Effort HVS 5a *** 2nd rpt 22/Sep Staden Main Quarry
The Nails E1 5b ** Lead O/S 18/Sep Staden Main Quarry
Suscipiat VS 4c ** 2nd 18/Sep Staden Main Quarry
Joint Effort HVS 5a *** Lead O/S 18/Sep Staden Main Quarry
Safety Net E1 5b *** Lead O/S 15/Sep Roaches Skyline
Mantelshelf Slab VS 4b * 2nd 15/Sep Roaches Skyline
Condor Slab VS 4c ** 2nd 15/Sep Roaches Skyline
Prelude to Space HVS 4c ** 2nd 15/Sep Roaches Skyline
Left Hand Route HS 4b ** 2nd 15/Sep Roaches Upper Tier
Right Hand Route HS 4c ** Lead O/S 15/Sep Roaches Upper Tier
Bamford Rib HVS 5a ** 2nd 09/Sep Bamford Edge
Dun HS 4b * 2nd 04/Sep Stanage Popular
Flying Buttress Direct E1 5b *** Lead O/S 04/Sep Stanage Popular
Hollybush Crack VD *** Lead rpt 04/Sep Stanage Popular
Scavenger VS 4c *** 2nd 29/Aug Three Cliffs Bay
Perseverance HS 4b * Lead O/S 29/Aug Three Cliffs Bay
Isis HVS 5a *** Lead O/S 28/Aug Fall Bay Buttress, King Wall,...
Ra HVS 5a 2nd 28/Aug Fall Bay Buttress, King Wall,...
Leaning Buttress Direct HVS 5b ** Lead O/S 17/Aug Stanage Popular
Cold Turkey HVS 5a ** 2nd 17/Aug Stanage Popular
Easter Rib E1 5b ** 2nd rpt 13/Aug Stanage Popular
Dry Rot E2 5b * 2nd 13/Aug Stanage Popular
Gullible's Travels E1 5b * Lead rpt 13/Aug Stanage Popular