showing 1-25
Name Grade Style Date Crag name
Outlook Slab VS 5a * 2nd rpt 29/Aug Stanage Plantation
Wall End Flake Crack VS 4c ** 2nd rpt 29/Aug Stanage Plantation
Tower Face Direct E2 5b *** TR O/S 29/Aug Stanage Plantation
Tower Face (Stanage) HVS 5a ** Lead O/S 29/Aug Stanage Plantation
Tower Face Indirect VS 4b * 2nd O/S 29/Aug Stanage Plantation
K2 S 4b * AltLd O/S 18/Aug Hen Cloud
Roof Climb VS 4b * AltLd rpt 18/Aug Hen Cloud
Bamford Rib HVS 5a ** Lead rpt 16/Aug Bamford Edge
Bamford Wall S 4a ** Lead O/S 16/Aug Bamford Edge
Reach VS 4c * 2nd O/S 16/Aug Bamford Edge
Ash Trees Forever HVS 5b * Lead O/S 19/Jul Burbage North
Artificial Stimulant E2 5b * TR RP 19/Jul Burbage North
Wall Corner The Direct Finish VS 4c * 2nd O/S 19/Jul Burbage North
Ash Tree Variations VS 5c * TR dnf 19/Jul Burbage North
Groove Above S 4b ** Lead O/S 17/Jul Idwal Slabs (aka Cwm Idwal)
Piton Route VS 4c ** 2nd O/S 17/Jul Idwal Slabs (aka Cwm Idwal)
Hope VD *** AltLd O/S 17/Jul Idwal Slabs (aka Cwm Idwal)
Paddock VD * 2nd O/S 14/Jul Higgar Tor
Greymalkin S 4a * Lead O/S 14/Jul Higgar Tor
Flake Crack HS 4b Lead rpt 23/Jun Castle Naze
The Nithin S 4a * Lead O/S 23/Jun Castle Naze
Block Cracks S Lead O/S 23/Jun Castle Naze
V Corner S 4b Lead O/S 23/Jun Castle Naze
Retroversion HVS 5a ** Lead O/S 21/Jun Stanage Popular
Right Twin Crack VS 4c * Lead O/S 21/Jun Stanage Popular